Dai Dong Tien Plastics Company is a highly respected company in Vietnam. They currently provide more than 250 kinds of plastic products for both factories and households, locally and throughout the world. With such a large network of distribution, Dai Dong Tien management is well aware of product quality and customer satisfaction. In order to meet growing production needs, Dai Dong Tien has refurbished its older factories and built new ones.
In 2005, team Ashford Formula Vietnam performed an initial trial to show Dai Dong Tien how well the Ashford Formula performs. The floor results were scientifically verified by an independent testing laboratory. After seeing the results, Dai Dong Tien asked Ashford Formula Vietnam to apply the Ashford Formula to the concrete floors of five of their newly built factories.
The recently constructed Hyundai Car Factory in Nošovice, Czech Republic is the second largest car manufacturing facility in the country, and Hyundai’s largest car manufacturing plant in Europe. Completed in November 2008, this facility is capable of producing 300,000 cars annually.
eMZet s.r.o., exclusive distributor of the Ashford Formula in the Czech Republic, treated over 1.3 million square feet (124,000 square meters) of concrete floors at this new facility. Meetings with Hyundai began in the late summer of 2007 and was followed by a successful application of the Ashford Formula on 107,640 square feet (10,000 square meters) of brand new concrete in the material supply section of the main warehouse. As a result of this very successful initial application, Hyundai requested that the Ashford Formula be applied to it’s transmission building, and subsequently to several other buildings totaling more than 1.3 million square feet (124,000 square meters).
Although the application was at times complicated, due to the machinery already being in place, eMZet s.r.o. was grateful to have the opportunity to partner with Hyundai and deliver exceptional results with the Ashford Formula. As Hyundai was one of the only car manufacturers in the world to record sales growth in 2009, eMZet s.r.o. is proud to have contributed to their success.
Our exclusive distributor in Germany, NORSA GmbH recently completed the floor for SEW Eurodrive’s cor porate headquarters in Bruchssal, Baden-Wurttemberg, Germany. They owners of the building specified the Ashford Formula on the 416,029 square feet / 38,650 square meter project, which was started in December 2008 and completed in August 2009. SEW Eurodrive is an “international organization that manufactures geared motors, frequency inverters and servo drives.” They employ over 11,000 people worldwide.
According to NORSA, the project was “an overall great experience” because the “quality standards during construction were set high.” The building owners understood that cleaning the floors were very important to achieving an excellent floor. Applicators originally cleaned the entire floor in preparation for the Ashford Formula, and for every subsequent application phase the owners cleaned and prepared the floor for the applicators.